facebooktwitterLinked in
  • Investor: Istraturist d.d.
  • Year: 2005.
  • Place: Umag
 

Description

With the reconstruction of the hotel Umag all necessary conditions for a 4 star hotel were fulfilled.
The existing hotel was fully reconstructed and a floor was added. An annex “Miramare” and the indoor swimming pool were completely demolished to make way for a new annex to the hotel and the main reception desk.
Reception desk, restaurant, cocktail lounge and kitchen are situated in the reconstructed part of the hotel, while the indoor swimming pool and the wellness centre are located in the annex to the hotel.
11.075,00 m2 of the building was reconstructed.

 
Share

Related projects